sreda, 3. juli 2024, 18:13
Sajt: Računarski centar Univerziteta u Beogradu - eLearning portal
Kurs: Integrisano modeliranje arhitektonskih objekata 2 (AF-201314-IM2)
Rečnik: Glossary
A

Active Option

The design option that you are currently editing. Elements in other options are hidden from view.

Area plan

Views that show spatial relationships based on area schemes and levels in your model. You can have multiple area plans for every area scheme and level.

Namena površina, plan funkcionalnih zona arhitektonskih objekata.

B

BOMA Area

BOMA area: The Building Owners and Managers Association (BOMA) has defined a set of definitions and area calculation rules that is widely used in the United States by architects, developers, and facilities managers to help standardize the process of office-building development. More information on the BOMA standards and calculation rules can be found at www.boma.org.

D

Demolished

The phase status assigned to elements that were created in an earlier phase and demolished in the current phase.

"Ruši se"

Design Option

An alternative design solution for a specific feature or problem. Design options are grouped into option sets.

E

Existing

The phase status assigned to elements that were created in an earlier phase and continues to exist in the current phase.

"Postojeće stanje"

G

Graphic Override

A rule that specifies how overridden elements be displayed based on their phase status.

Gross Area

Gross area: The overall area of a floor or footprint of the building.

Bruto površina objekta

 

N

New

The phase status assigned to elements that were created in the phase of the current view.

 "Zida se"

O

Option Set

A collection of design alternatives that focus on a particular aspect or feature of the design.

P

Phase Filter

A phase filter is a rule that you apply to a view to control the display of elements based on their phase status. Filters can specify that elements be displayed by category, overridden, or not shown.

Phase Status

The status of each building element relative to the phase specified for the current view. Each phase status typically has a different display style associated with it to make it easy to identify the phase status of the elements in a view.

Primary Option

The currently selected default design option, which is displayed in views by default (where a specific option has not been specified).

 

Project Phase

A distinct time period in the life of the project.

R

Rentable Area

Rentable area: Individual developers and leasing companies can use different standards and rules for computing rentable areas. For example, rentable area can be defined to include all the spaces in a building except egress corridors, vertical transportation, and mechanical spaces.

 Površina za izdavanje

Room

A defined space in a building, used for a specific purpose and separated from other areas by walls, partitions, or room separation lines.

Room bounding elements

A model element that defines a boundary of a room, such as walls, partitions, floors, ceilings, and roofs.

S

Schedule

A tabular display of information, extracted from the properties of the elements in a project. A schedule can list every instance of the type of element being scheduled, or it can collapse multiple instances onto a single row, based on the schedule’s grouping criteria.

Tabelarni pregled (površina, prostorija...)

T

Temporary

The phase status assigned to elements that were created and demolished during the current phase.

U

Usable Area

The area in a plan that is actually usable by clients and tenants. Usable area typically excludes areas taken up by columns, walls, mechanical rooms, and shafts and other nonusable space.

Korisna površina